Dwi Agus Winarto, Ratnaningsih, A. and Jojok Widodo Soetjipto (2023) “Analysis of Project Performance and Completion Time Using Evm and Cpm-Pert Methods (Case Study of Road Reconstruction Project)”, International Journal of Sciences: Basic and Applied Research (IJSBAR), 70(1), pp. 269–280. Available at: https://www.gssrr.org/JournalOfBasicAndApplied/article/view/16224 (Accessed: 18 September 2025).